We publish what our factory can produce and how it controls quality. We do not publish the factory name or address, because every brand running a programme on the same lines — including yours — depends on that staying private. What we will do is open the process: capacity, integration depth, inspection stages, documentation output, and audit access under NDA for qualified programmes.
Capacity figures describe installed annual capability across the site, not a commitment to any single programme. Available allocation is confirmed per programme against the current build schedule.
L3 · L7 · L9 · L10 · L11 · four-wheel & three-wheel
N5 · N8 · N9 · X-series · EN 17128
M1 · M2 · EN 15194 · 250 W
M3 · L1e tier
Booked after specification lock, never before — so colours, graphics, packaging and labelling are frozen when the line starts.
Frame, motor, battery pack and controller integrated in-house; approximately 50 days.
Build and inspection reporting, then CBU, SKD or CKD release with the compliance documentation set.
The commercial stages that come before this — brief, programme sheet and sample build — are set out on the OEM programme page.
Documentation is the part of an OEM programme that fails at the border, not on the line. These are the outputs we commit to.
We supply the manufacturing facts within our control. We do not give tariff or legal advice, and we do not make origin determinations — that belongs to your broker or counsel.
Because multiple brands run programmes on the same lines. Publishing the site would expose every partner's supply chain, including yours. We publish capability, capacity and compliance output instead, and we open the site to audit under NDA for qualified programmes.
Yes, under NDA, for qualified programmes. Third-party pre-shipment inspection is available on any programme without an NDA.
No. It describes installed annual capability across the site. Your allocation is confirmed per programme against the current build schedule.
Approximately 50 days from specification lock, subject to the production slot and the configuration ordered. ODM programmes with new tooling carry a longer first-article timeline, quoted separately.
Frame, motor, battery pack and controller integration are handled on the same site. Component-level detail, including where each major sub-assembly is produced, is stated in the programme sheet.
By production slot, booked at specification lock. A programme with a locked specification and a confirmed deposit holds its slot; an enquiry still in sampling does not. That is why the sample stage carries a date rather than staying open.
Tell us the category, the market and the volume band. We will return a programme sheet with configuration options, MOQ, lead time, kit level and the documentation set — and arrange an audit under NDA if the programme warrants it.